Tobago CEC

  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
CEC Ref # Date Received Applicant Activity Description Location Status
Page 1 of 48
  • Start
  • Prev
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • Next
  • End
Draft TOR 30-Dec-2020(1)
No records
6085/2020 2020-09-18 Coastal Technologies Limited 8,9,12, 13, 14(a), 18(b), 29, 31(a), 33(a)(b), 34, 35, 38 ©, 40(a), 41(a), 42, 43(a)(b)© the establishment of a Marina Resort Village with berthing for 420 yachts, access channel, turning basin and causeway associated residential and commercial buildings, fisherfolk facility, boardwalk, bunkering, desalination and wastewater treatment facilit Milford Bay, West Coast,
South West, Tobago
Draft TOR 30-Dec-2020
View
CEC ISSUED 13-Dec-2012(1)
No records
3715/2012 2012-11-22 Water and Sewerage Authority (WASA) 40(b) The installation of distribution pipelines and its appurtenances Junction of Top Hill and Speyside Main Road to Manta Lodge along Winward Road, Tobago CEC ISSUED 13-Dec-2012
View
CEC ISSUED 18-Dec-2012(1)
No records
3714/2012 2012-11-22 Water and Sewerage Authority (WASA) 40(b) The installation of 3.7 km of 200-mm distribution pipeline and its appurtenances Bloody Bay Lift Station to the junction of Bloody Bay and Roxborough/Bloody Bay Road, Tobago CEC ISSUED 18-Dec-2012
View
CEC ISSUED 06-Nov-2013(1)
No records
3987/2013 2013-09-16 Javid Walker and Tricia Gibbings walker 1(a), 8(c) The clearing, excavation of land for more stability for the extension of farming/ rearing of sheep, goat and rabbits Orange Hill road, Scarborough, Tobago CEC ISSUED 06-Nov-2013
View
2nd Clarifcation Letter 16-November-2023(1)
No records
6704/2023 2023-07-25 The Institute of Marine Affairs (IMA)  13(a), 43 (b) For the establishment of the IMA Tobago Field Station/Office )approx 10,00 sq. ft. 2-storey building) at Pigeon Point, Tobago. (inclusive of a slipway). The propsoed field station will have a wet/dry microbiology lab, coral research area, boatshed, 4-bedr Off Pigeon Point Road (Pigeon Point Heritage Park) Tobago 2nd Clarifcation Letter 16-November-2023
View
2nd Ext. Req. Resp Letter 22-Dec-2023(1)
No records
6721/2023 2023-08-28 Biostratigraphic Associates (Trinidad) Ltd. 24 Conduct a three dimensional multi client seismic survey offshore of Trinidad and Tobago Offshore 2nd Ext. Req. Resp Letter 22-Dec-2023
View
2nd Response to Exemption Letter 6-Sep-2022(1)
No records
5982/2020 2020-03-05 Warner Construction & Sanitation Ltd c/o Brandon Rampersad 23, 39 the modification of a facility for mining and processing andesite Greenhill, Mt. St. George, Tobago 2nd Response to Exemption Letter 6-Sep-2022
View
Ack Letter/ Further Info 14-May-2008(1)
No records
2272/2008 2008-04-30 Bryan Kisson 5 Fell and Extraction of Timber Little River, Richmond Starwood, Tobago Ack Letter/ Further Info 14-May-2008
View
Ack letter/F.I. 09-June-2003(1)
No records
0485/2003 2003-05-28 Clarie & Deon Rojas 21 Establishment of a Facility for Manufacture of Gates, Metal Furniture, etc Cannan Tobago Ack letter/F.I. 09-June-2003
View
Ack. Ltr/F.I: 19-May-2009(1)
No records
1474/2006 2006-05-17 Clifford Muray, 11(a) Construction of a 27 room block for guestrooms on existing hotel facility Crown point, Tobago Ack. Ltr/F.I: 19-May-2009
View