CEC Summary

6676/2023
2023-06-21
WASA
38 (b), 40 (b)
The Drilling, Developing and equipping of the Aripo C Well including the installation of 2.8km of 150mm polyvinyl chloride pipeline inclusive of all bridge crossings and it appurtenances
Cassava Drive, La Platter Gardens, Aripo/Wallerfield
CEC ISSUED 07-July-2023