CEC Summary

6410/2022
WASA
38(b), 40(b)
Drilling, developing and equipping of the Talparo #2 Well for production status and the l
aying of 1.37km of 150mm transmission pipeline and associate appurtenances.
159m South East LP 613,Tamana Road,Talparo
CEC ISSUED 26-May-2022