CEC Summary
id
6356
CEC Ref #
6355/2022
Date Received
2022-01-27
Applicant
BPTT
Activity
27, 29
Description
Construction of a new 500,000 bbls capacity storage tank and Replacement of the 42-inch piping that is utilized to transfer product from the storage tanks to the loading pumps at bp Trinidad and Tobago (bpTT) Galeota Point Terminal facility.
Location
Mayaro
Status
CEC ISSUED 17-Oct-2022
files
file list