EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request
  • Tobago - CEC Summary

CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 686 of 710 Total: 7092
  • Start
  • Prev
  • 681
  • 682
  • 683
  • 684
  • 685
  • 686
  • 687
  • 688
  • 689
  • 690
  • Next
  • End
Alescon Readymix Limited(1)
No records
6851/2024 2024-03-25 Alescon Readymix Limited 18 (b) The establishment of a concrete batching plant. #3 Eccles Road, Guayaguayare Mayaro Road, Grand Lagoon, Mayaro. CEC ISSUED 03-May-2024
View
Land Settlement Agency(1)
No records
6852/2024 2024-03-27 Land Settlement Agency TBD The subdivision of 32.6 hectares of land into approximately 320 residential lots to facilitate squatter regularization. River Estate, Diego Martin NO CEC Required 26-April-2024
View
Water and Sewerage Authority (WASA)(3)
No records
6853/2024 2024-04-03 Water and Sewerage Authority (WASA) 38 (b), 40 (b) The Drilling, Developing and equipping of Talparo #2 well for production status and the installation of 2.28KM of 150MM vinyl chloride pipeline inclusive of associated appurtences from the proposed Talparo #2 well to the Talparo water treatment plant alon Talparo CEC ISSUED 20-May-2024
View
6854/2024 2024-04-03 Water and Sewerage Authority (WASA) 38 (b), 40 (b) Drilling, developing and equipping of Valencia #1 for production status and the instalation of 6.5KM of 200-mm poly vinyl chloride pipeline, inclusive of associated appurtenances, from the Valencia well #1 off Valencia stretch Farm Road to the existing Ho Valencia CEC ISSUED 17-May-2024
View
6855/2024 2024-04-03 Water and Sewerage Authority (WASA) 38 (b), 40 (b) The drilling, developing and equipping of the Wallerfield #20 well for production status at L.P. No. 17 Hamilton siding and the installation of 1.543 km of a 150-MM poly vinyl chrolride pipeline, inclusive of associated appurtenances, from the proposed Wa Wallerfield CEC ISSUED 22-May-2024
View
Trinidad & Tobago National Petroleum Marketing Co. Ltd. (1)
No records
6856/2024 2024-04-03 Trinidad & Tobago National Petroleum Marketing Co. Ltd. 43 (a) The Upgrade of an existing Fuel service station at the corner of the Churchhill-Roosevelt Highway and Marequito avenue, Valsayn Valsayn 2nd Clarification Letter 08-April-2025
View
Cyrus Logan (1)
No records
6857/2024 2024-04-08 Cyrus Logan 5 (c) The establishment of a sawmill on 0.4 hectares of land located at L.P. 16-A-1 Coora Branch Extension, Siparia. L.P. 16-A-1 Coora Branch Extension, Siparia. Clarification Letter 07-March-2025
View
Christopher Glasgow (1)
No records
6858/2024 2024-04-11 Christopher Glasgow 1 (a) The modification of an abandoned livestock farm to convert from the rearing of horses and pigs to the rearing of a maximum of 10,00 heads of broilers per cycle at L.P. 54 Orinoco Road, Hamilton siding Wallerfield Wallerfield CEC ISSUED 14-November-2024
View
Kishan Ramkissoon(1)
No records
6859/2024 2024-04-11 Kishan Ramkissoon 1 (a) The establishment of a Poultry Farm Cumuto Ack/FI Letter 24-April-2024
View
Institute of Marine Affairs(1)
No records
6860/2024 2024-04-12 Institute of Marine Affairs N/A The biological restoration of coral reefs, through the larvial propagation method, in Speyside and Charlotteville, Northeast, Tobago North East Tobago - Speyside (primarily), Charlotteville (secondarily) NO CEC Required 25-March-2024
View
  • You are here:  
  • Home

Back to Top

© 2025 EMA E-Summary