No records
|
6851/2024 |
2024-03-25 |
Alescon Readymix Limited |
18 (b) |
The establishment of a concrete batching plant. |
#3 Eccles Road, Guayaguayare Mayaro Road, Grand Lagoon, Mayaro. |
CEC ISSUED 03-May-2024 |
|
|
6852/2024 |
2024-03-27 |
Land Settlement Agency |
TBD |
The subdivision of 32.6 hectares of land into approximately 320 residential lots to facilitate squatter regularization. |
River Estate, Diego Martin |
NO CEC Required 26-April-2024 |
|
|
6853/2024 |
2024-04-03 |
Water and Sewerage Authority (WASA) |
38 (b), 40 (b) |
The Drilling, Developing and equipping of Talparo #2 well for production status and the installation of 2.28KM of 150MM vinyl chloride pipeline inclusive of associated appurtences from the proposed Talparo #2 well to the Talparo water treatment plant alon |
Talparo |
CEC ISSUED 20-May-2024 |
|
|
6854/2024 |
2024-04-03 |
Water and Sewerage Authority (WASA) |
38 (b), 40 (b) |
Drilling, developing and equipping of Valencia #1 for production status and the instalation of 6.5KM of 200-mm poly vinyl chloride pipeline, inclusive of associated appurtenances, from the Valencia well #1 off Valencia stretch Farm Road to the existing Ho |
Valencia |
CEC ISSUED 17-May-2024 |
|
|
6855/2024 |
2024-04-03 |
Water and Sewerage Authority (WASA) |
38 (b), 40 (b) |
The drilling, developing and equipping of the Wallerfield #20 well for production status at L.P. No. 17 Hamilton siding and the installation of 1.543 km of a 150-MM poly vinyl chrolride pipeline, inclusive of associated appurtenances, from the proposed Wa |
Wallerfield |
CEC ISSUED 22-May-2024 |
|
|
6856/2024 |
2024-04-03 |
Trinidad & Tobago National Petroleum Marketing Co. Ltd. |
43 (a) |
The Upgrade of an existing Fuel service station at the corner of the Churchhill-Roosevelt Highway and Marequito avenue, Valsayn |
Valsayn |
Clarifiaction Letter 11-November -2024 |
|
|
6857/2024 |
2024-04-08 |
Cyrus Logan |
5 (c) |
The establishment of a sawmill on 0.4 hectares of land located at L.P. 16-A-1 Coora Branch Extension, Siparia. |
Siparia |
2nd Extension Letter 19-August-2024 |
|
|
6858/2024 |
2024-04-11 |
Christopher Glasgow |
1 (a) |
The modification of an abandoned livestock farm to convert from the rearing of horses and pigs to the rearing of a maximum of 10,00 heads of broilers per cycle at L.P. 54 Orinoco Road, Hamilton siding Wallerfield |
Wallerfield |
CEC ISSUED 14-November-2024 |
|
|
6859/2024 |
2024-04-11 |
Kishan Ramkissoon |
1 (a) |
The establishment of a Poultry Farm |
Cumuto |
Ack/FI Letter 24-April-2024 |
|
|
6860/2024 |
2024-04-12 |
Institute of Marine Affairs |
N/A |
The biological restoration of coral reefs, through the larvial propagation method, in Speyside and Charlotteville, Northeast, Tobago |
North East Tobago - Speyside (primarily), Charlotteville (secondarily) |
NO CEC Required 25-March-2024 |
|
|