EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request
  • Tobago - CEC Summary

CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 684 of 710 Total: 7092
  • Start
  • Prev
  • 679
  • 680
  • 681
  • 682
  • 683
  • 684
  • 685
  • 686
  • 687
  • 688
  • Next
  • End
Water and Sewerage Authority (WASA)(6)
No records
6831/2024 2024-02-29 Water and Sewerage Authority (WASA) 38 (b) Drilling, Developing and equipping of the Carapal Wells C&D for production Status. Located at L.P. #164 Carapal Road, Carapal L.P. #164 Carapal Road, Carapal CEC ISSUED 28-March-2024
View
6832/2024 2024-02-29 Water and Sewerage Authority (WASA) 38 (b) Drilling, Developing and equipping of the Carapal Wells E for production Status, inclusive of associated works, L.P. #13 Rancho Quemado Road, Carapal CEC ISSUED 02-April-2024
View
6834/2024 2024-02-29 Water and Sewerage Authority (WASA) 38 (b) Drilling, Developing, and equipping of Palo Seco Well A for production Status. Off S.S Erin Road, Palo Seco CEC ISSUED 21-March-2024
View
6835/2024 2024-02-29 Water and Sewerage Authority (WASA) 38 (b) Drilling, Developing, and equipping of Palo Seco Well B for production Status. Oil Field Road, Off Los Bajos Road, Palo Seco CEC ISSUED 27-March-2024
View
6837/2024 2024-03-01 Water and Sewerage Authority (WASA) 38 (b) Drilling, developing and equipping of the Waddle #1 Well for production status Off S.S Erin Road, Waddle Village CEC ISSUED 26-March-2024
View
6840/2024 2024-03-08 Water and Sewerage Authority (WASA) 38 Drilling, developing and equipping of the Los Bajos Wells 1B & 2B for production status L.P #53 Off Third Street, Los Bajos Road; Los Bajos CEC ISSUED 26-March-2024
View
Rennie Charan(1)
No records
6833/2024 2024-02-29 Rennie Charan 1 (a) Establishment of a Poultry farm for the rearing of a maximum of 10,000 heads of broilers per cycle 1 1/2mm Scotts Road, Penal CEC ISSUED 26-April-2024
View
National Infrastructure Development Company Limited (NIDCO)(1)
No records
6836/2024 2024-03-01 National Infrastructure Development Company Limited (NIDCO) 18 (a) To Replace the dry mix concrete batching plant with a second wet mix concrete batching plant within the crown point project site for the new terminal building for the ANR Robinson International Airport, Corwn Point, Tobago. County St. Patrick, Crown Point, Tobago CEC ISSUED 23-May-2024
View
Skylon Concrete Limited (2)
No records
6838/2024 2024-03-07 Skylon Concrete Limited 18 (a) (b) The modification of an abandoned concrete plant facility for the re-establishment of a functional concrete batching plant at Guaracara Tabaquite Road, Harmony Hall, Gasparillo. Guaracara Tabaquite Road, Harmony Hall, Gasparillo. CEC ISSUED 30-September-2024
View
6839/2024 2024-03-08 Skylon Concrete Limited 18 (a) Request to expedite determinations for Certificate of Environmental Clearance (CEC6838/2024) for the modification of an abandoned concrete plant facility for the re-establishment of a functional concrete batching plant at Guaracara Tabaquite Road, Harmony California, Couva CEC ISSUED 14-June-2024
View
  • You are here:  
  • Home

Back to Top

© 2025 EMA E-Summary