6831/2024 |
2024-02-29 |
Water and Sewerage Authority (WASA) |
38 (b) |
Drilling, Developing and equipping of the Carapal Wells C&D for production Status. Located at L.P. #164 Carapal Road, Carapal |
L.P. #164 Carapal Road, Carapal |
CEC ISSUED 28-March-2024 |
|
|
6832/2024 |
2024-02-29 |
Water and Sewerage Authority (WASA) |
38 (b) |
Drilling, Developing and equipping of the Carapal Wells E for production Status, inclusive of associated works, |
L.P. #13 Rancho Quemado Road, Carapal |
CEC ISSUED 02-April-2024 |
|
|
6833/2024 |
2024-02-29 |
Rennie Charan |
1 (a) |
Establishment of a Poultry farm for the rearing of a maximum of 10,000 heads of broilers per cycle |
1 1/2mm Scotts Road, Penal |
CEC ISSUED 26-April-2024 |
|
|
6834/2024 |
2024-02-29 |
Water and Sewerage Authority (WASA) |
38 (b) |
Drilling, Developing, and equipping of Palo Seco Well A for production Status. |
Off S.S Erin Road, Palo Seco |
CEC ISSUED 21-March-2024 |
|
|
6835/2024 |
2024-02-29 |
Water and Sewerage Authority (WASA) |
38 (b) |
Drilling, Developing, and equipping of Palo Seco Well B for production Status. |
Oil Field Road, Off Los Bajos Road, Palo Seco |
CEC ISSUED 27-March-2024 |
|
|
6836/2024 |
2024-03-01 |
National Infrastructure Development Company Limited (NIDCO) |
18 (a) |
To Replace the dry mix concrete batching plant with a second wet mix concrete batching plant within the crown point project site for the new terminal building for the ANR Robinson International Airport, Corwn Point, Tobago. |
County St. Patrick, Crown Point, Tobago |
CEC ISSUED 23-May-2024 |
|
|
6837/2024 |
2024-03-01 |
Water and Sewerage Authority (WASA) |
38 (b) |
Drilling, developing and equipping of the Waddle #1 Well for production status |
Off S.S Erin Road, Waddle Village |
CEC ISSUED 26-March-2024 |
|
|
6838/2024 |
2024-03-07 |
Skylon Concrete Limited |
18 (a) (b) |
The modification of an abandoned concrete plant facility for the re-establishment of a functional concrete batching plant at Guaracara Tabaquite Road, Harmony Hall, Gasparillo. |
Guaracara Tabaquite Road, Harmony Hall, Gasparillo. |
CEC ISSUED 30-September-2024 |
|
|
6839/2024 |
2024-03-08 |
Skylon Concrete Limited |
18 (a) |
Request to expedite determinations for Certificate of Environmental Clearance (CEC6838/2024) for the modification of an abandoned concrete plant facility for the re-establishment of a functional concrete batching plant at Guaracara Tabaquite Road, Harmony |
California, Couva |
CEC ISSUED 14-June-2024 |
|
|
6840/2024 |
2024-03-08 |
Water and Sewerage Authority (WASA) |
38 |
Drilling, developing and equipping of the Los Bajos Wells 1B & 2B for production status |
L.P #53 Off Third Street, Los Bajos Road; Los Bajos |
CEC ISSUED 26-March-2024 |
|
|