No records
|
6771/2023 |
2023-11-08 |
Reynold Patrong |
23 |
The etablishment of a facility of a factory for mining and processing of sand and gravel on 8.098 ha (20 acres) parcel land tatto Trace , Valencia. |
tattoo Trace, Block 2, Valencia |
Status Update Letter 12-Sept-2024 |
|
|
6772/2023 |
2023-11-08 |
Water and Sewerage Authority (WASA) |
40 (b) |
The Installation of 3.1 Km of 200-mm Polyvinyl Chloride Pipeline Inclusive of all Crossings and Appurtenances |
Southern Main Road, School Street, Fullerton Junction, Icacos/Fullerton |
CEC ISSUED 01-December-2023 |
|
|
6773/2023 |
2023-11-14 |
BG International / BP Exploration Operating Company Ltd.(BGI/BPOEC) |
24 |
The Conduct of a 3-Dimensional Seismic Survey with a total area of 4,000 km2 within Blocks 25A, 25B and 27, East Coast Marine Area, Offshore, Trinidad |
Off Shore |
CEC ISSUED 09-May-2024 |
|
|
6774/2023 |
2023-11-15 |
Joel Butcher |
38 (a) , 40(c) |
The Excavation, Modification and Abstraction from a River to Facilitate Crop Irrigation and Animal Watering on a Farm on 1.6 hectares of land at Bushy Park Branch Road, Glamorgan, Tobago |
Bushy Park, Glamorgan, Tobago |
Ack/FI Letter 11-Jan-24 |
|
|
6775/2023 |
2023-11-16 |
Judy Ramlal-Holder |
41 (a) (b) |
The establishment of infrastructure for residential homestead plots on 1.1716 hectares of land for the future development. |
LP No. 14, Sand Hill Trace, Tabaquite |
CEC ISSUED 05-September-2024 |
|
|
6776/2023 |
2023-11-16 |
Land Settlement Agency |
8 (a), 9, 33(a)(c), 40 (a), 41 (a) |
The installation of infrastructure and subdivision at an existing 40.43- Hectare Unplanned Residential Development |
Point Fortin |
CEC ISSUED 10-July-2024 |
|
|
6777/2023 |
2023-11-17 |
Water and Sewerage Authority (WASA) |
40 (b) |
The installation of two (2) kilometres of 100-mm and 150-mm polyvinyl chloride pipelines inclusive of all crossings and associated appurtenances |
Rampersad Trace, Syfoo Trace, Granville (old) Road |
CEC ISSUED 20-December-2023 |
|
|
6778/2023 |
2023-11-17 |
Lincoln Ramlal |
1 (a) |
The Expansion of an Existing Poultry Farm to include an additional 500 heads of Broilers to attain a Maximum of 7,500 heads per cycle and Associated Infrastructure at No. 42 Diaz Road, Tabaquite. |
#42 Diaz Road Tabaquite |
Ack/FI Letter 29-Nov-2023 |
|
|
6779/2023 |
2023-11-21 |
Chantal Perryman |
8 (c) |
The Clearing, Cutting and Grading of Land with a Gradient of 1:4 or more to Facilitate the Establishment of a Single-Family Residence at Lot # 9, Cromwell Road, Cascade |
Lot #9 Cromwell Road, Cascade |
CEC ISSUED 15-October-2024 |
|
|
6780/2023 |
2023-11-23 |
Sonriz Engineering Services Limited |
38 |
The Establishment of a Facility for the Storage and Handling of Used Automotive Batteries for Packaging and Exporting at Lot #21 Labidco Industrial Estate, La Brea |
Lot #21 C Labidco Industrial Estate, la Brea |
Ack/FI Letter 07-Dec-2023 |
|
|