No records
|
6751/2023 |
2023-10-10 |
EOG Resources Trinidad Limited |
26,27 |
The establishment of a 16-inch diameter multiphase pipeline, 22.5 kilometres long, and associated modifications to the Pelican Platform including installation of a 16-inch riser, metering skid and piping modifications |
Offshore, East coast Trinidad |
CEC ISSUED 04-March-2024 |
|
|
6752/2023 |
2023-10-12 |
Chris Jeremy Ramkissoon |
1 (a) |
The establishment of a poultry farm for the rearing of a maximum of 40,000 heads of broilers per cycle on 3716 m2 of land |
Haggard Trace, Penal Rock road, Penal |
CEC ISSUED 24-November-2023 |
|
|
6753/2023 |
2023-10-12 |
The Princes Town Regional Corporation |
31 (a), (b) |
The Upgrade of a Sport Tourism and Heritage Park Located at Manahambre Road, Princes Town |
Manahambre Road, St. Madeleine, Princes Town |
NO CEC Required 21-February-2024 |
|
|
6754/2023 |
2023-10-12 |
Martin Burysingh |
1 (a), 39 |
The establishment of a poultry farm for the rearing of a maximum of 20,000 heads of broilers per cycle on 0.809 hectares of land |
#47 Lynch Trace, Mamoral #1 |
CEC ISSUED 05-January-2024 |
|
|
6755/2023 |
2023-10-13 |
Keith Isidore |
43 (a) |
Repairing of vehicles, straightening and painting |
LP #138-4 Thin drive, Carapo Road Arima |
Resp. Ext Letter 27-Dec-2023 |
|
|
6756/2023 |
2023-10-17 |
Happi Products Ltd |
20 |
To modify and expand (inclusive of associated works) to its existing facility for the production and packaging of dish washing liquid and liquid detergent |
#97 Bamboo main road, Bamboo settlement #2, Valsayn, Trinidad |
NO CEC Required 01-December-2023 |
|
|
6757/2023 |
2023-10-18 |
Water and Sewerage Authority (WASA) |
38 (b) |
Drilling Developing and equipping of the Granville C Well for production status inclusive of Associated Works. |
Rampersad Trace, off Syfoo Road, Granville/Cedros |
CEC ISSUED 14-November-2023 |
|
|
6758/2023 |
2023-10-18 |
Water and Sewerage Authority (WASA) |
38 (b) |
The drilling, developing and equipping of one (1) waterwell (Granville A or Granville B) for production status |
Granville Road, Granville/Cedros |
CEC ISSUED 02-November-2023 |
|
|
6759/2023 |
2023-10-18 |
BP Trinidad and Tobago LLC (BPTT) |
26 (a) |
The modification and commissioning of the existing produced water (pw) treatment system to include installation of a temporary solids filter and coalescer to allow for a trial for offshore pw discharge off the Cassia B Platform for a maximum period of nin |
Cassia B platform of South East Galeota Block |
CEC ISSUED 05-January-2024 |
|
|
6760/2023 |
2023-10-18 |
Trevor Ramcharan |
14 (b), 20 (a) |
The establishment of a sodium hypochlorite Manufacturing facility with a maximum capacity of 284,000 litres per year for the production and storage of sanitizer and corn processing facility with a capacity of 200 metric tonnes per year at L.P. No. 65 Rams |
LP #65 Ramsaran Trace Off Warren Road, Bejucal, Cunupia |
CEC ISSUED 21-March-2024 |
|
|