6670/2023 |
2023-06-09 |
WASA |
38 (b) |
Drilling, developing and equipping of the Mayaro #18 Wells for production status |
Cedar Grove Road, Mayaro |
CEC ISSUED 18-July-2023 |
|
|
6671/2023 |
2023-06-09 |
WASA |
38 (b) |
Drilling, developing and equipping of the Mayaro #20 Well for production status |
Gregorio Road, Mayaro |
CEC ISSUED 20-July-2023 |
|
|
6672/20223 |
2023-06-15 |
Division of Infrastructure Quarries and Urban Development |
8 (a), 9, 33 (a)(b) |
The establishment of a 2.5km flexible pavement, single carriageway at friendship Estate, from Cove Road to Store Bay Local Road |
Friendship Estate, South West, Tobago |
CEC ISSUED 6-September-2023 |
|
|
6673/2023 |
2023-06-16 |
Mackenzie P Investment Company Limited |
6, 8 (a,b) |
Clearing and grading of land and establishment of a fruit/vegetable farm |
Opp LP# Sin Verguenza Road, Cumuto |
Ack/FI 30-June-2023 |
|
|
6674/2023 |
2023-06-16 |
EcoEnergy (Trinidad) Limited |
8 (a), 23 |
Clearing of land to establish a facility for the quarrying of quartzitic sand and gravel |
Toco Main Road, Valencia |
Ack/FI 04-July-2023 |
|
|
6675/2023 |
2023-06-20 |
WASA |
40 (b) |
Installation of a total of 3.68km of PVC Main and their appurtenances including bridge/culvert, crossings and road reinstatement |
From Hillsborough West Water Treatment Plant along the Belmont Road for 2.1km and along Road Reserve off the Belmont Road for 1.58km, Belmont Road, Tobago |
CEC ISSUED 09-August-2023 |
|
|
6676/2023 |
2023-06-21 |
WASA |
38 (b), 40 (b) |
The Drilling, Developing and equipping of the Aripo C Well including the installation of 2.8km of 150mm polyvinyl chloride pipeline inclusive of all bridge crossings and it appurtenances |
Cassava Drive, La Platter Gardens, Aripo/Wallerfield |
CEC ISSUED 07-July-2023 |
|
|
6677/2023 |
2023-06-21 |
WASA |
38 (b), 40 (b) |
The Drilling, Developing and equipping of the Aripo B Well in the Aripo wellfield Inclusive of Associated Works |
Unnamed road off Aripo Road, Aripo/Wallerfield |
CEC ISSUED 14-July-2023 |
|
|
6678/2023 |
2023-06-21 |
Robert Benoit |
6, 8 (a)b), 39 |
Establishment of a fruit and vegetable farm |
Poole Trace, Rio Claro |
CEC ISSUED 22-August-2023 |
|
|
6679/2023 |
2023-06-26 |
National Gas Company of Trinidad and Tobago |
27 |
The Removal of above ground segment of 4" pipeline at the Caparo River-crossingvand establishment of this segment below the riverbed using horizontal directional drilling. |
Caparo Valley, Brasso road, Longdenville |
Clarfication Letter 12-August-2024 |
|
|