No records
|
6621/2023 |
2023-03-29 |
Jacqueline Lazarus |
8 (c) |
The clearing, excavation and grading of Land with a gradient of 1:4 or more to facilitate the Establishment of six (6) Townhouse Units on 1565.2 square meters of Land at Hiltop Drive, Maraval. |
Hilltop Drive, Saddle Hill, Maraval |
CEC ISSUED 07-May-2024 |
|
|
6622/2023 |
2023-03-29 |
WASA |
40 (b) |
The installation of 3.80km of 100mm PVC pipeline from the proposed Clarke Road Well #9 to Clarke Road Well #10 along Satnarine Trace, Ramsingh Trace, Rochard Road, Rampersad Trace and Clarke Road inclusive of all crossings and associated |
along Satnarine Trace, Ramsingh Trace, Rochard Road, Rampersad Trace and Clarke Road |
CEC ISSUED 24-Apr-2023 |
|
|
6623/2023 |
2023-03-29 |
WASA |
40 (b) |
The installation of 3.12km of 200mm PVC pipeline along Rickson Road, La Cuesa Road, Arena Road and Rodney Road, Freeport inclusive of all crossings and associated appurtenances |
Along Rickson Road, La Cuesa Road, Arena Road and Rodney Road, Freeport |
CEC ISSUED 11-May-2023 |
|
|
6624/2023 |
2023-03-31 |
WASA |
40 (b) |
The installation of 2.88km of 150mm PVC pipeline from the Freeport #24 Well along Pine Bush Road, Milton Road, Rivulet Road and Camden Road inclusive of all crossings and associated appurtenances |
Along Pine Bush Road, Milton Road, Rivulet Road and Camden Road, Couva |
CEC ISSUED 18-Apr-2023 |
|
|
6625/2023 |
2023-03-31 |
WASA |
40 (b) |
The installation of 1.8km of 100mm PVC Main and its appurtenances including road reinstatement |
From LP #159 to LP #185 Lopinot Road, Lopinot |
CEC ISSUED 19-Apr-2023 |
|
|
6626/2023 |
2023-03-31 |
Perenco T&T Limited |
25, 26 |
The re-drill of SA-02 oil well and SA-12 gas well at the Samaan Alpha Complex located in the Samaan Field, TSP Block, Offshore South-East Coast, Trinidad |
Samaan Alpha Complex, Samaan Field, TSP Block, Offshore South East Coast, Trinidad |
CEC Response Letter- Partial Response 21-Nov-2024 |
|
|
6627/2023 |
2023-03-31 |
Renaissance Energy Limited |
25,27 |
The drilling of ten (10) Infill wells and installation of associated pipelines for transmission of crude oil to Renaissance Energy Limited's Gathering Station |
#9- #11 KPA Road, GP Road, Barrackpore |
CEC ISSUED 31-July-2023 |
|
|
6628/2023 |
2023-04-04 |
Manni Baal |
6, 8 (c), 41 (a)(b) |
Land Clearance, Preparation and Remove of Soil to Flatten the Land |
Durham Mills Road, Caparo |
CEC ISSUED 15-June-2023 |
|
|
6629/2023 |
2023-04-06 |
Dennis Bristol c/o POS City Corporation |
42 |
To establish a Wastewater Treatment Plant in the community of Sea Lots |
Sea Lots, Port-of-Spain |
Status Update Letter 15-August-2023 |
|
|
6630/2023 |
2023-04-12 |
David Tahal |
8 (c) |
Construction of a two storey residential house with lower basement level |
Lot 33, The Buoys, Dheins Bay, Carenage |
Ack/FI 26-Apr-2023 |
|
|