6853/2024 |
2024-04-03 |
Water and Sewerage Authority (WASA) |
38 (b), 40 (b) |
The Drilling, Developing and equipping of Talparo #2 well for production status and the installation of 2.28KM of 150MM vinyl chloride pipeline inclusive of associated appurtences from the proposed Talparo #2 well to the Talparo water treatment plant alon |
Talparo |
CEC ISSUED 20-May-2024 |
|
|
6854/2024 |
2024-04-03 |
Water and Sewerage Authority (WASA) |
38 (b), 40 (b) |
Drilling, developing and equipping of Valencia #1 for production status and the instalation of 6.5KM of 200-mm poly vinyl chloride pipeline, inclusive of associated appurtenances, from the Valencia well #1 off Valencia stretch Farm Road to the existing Ho |
Valencia |
CEC ISSUED 17-May-2024 |
|
|
6855/2024 |
2024-04-03 |
Water and Sewerage Authority (WASA) |
38 (b), 40 (b) |
The drilling, developing and equipping of the Wallerfield #20 well for production status at L.P. No. 17 Hamilton siding and the installation of 1.543 km of a 150-MM poly vinyl chrolride pipeline, inclusive of associated appurtenances, from the proposed Wa |
Wallerfield |
CEC ISSUED 22-May-2024 |
|
|