EMA E-Summary
Toggle Navigation
  • CEC Summary
  • EIA Summary
  • FOI Request
  • Information Centre Requests
    • General Request
    • National Register Request
  • Tobago - CEC Summary

CEC Summary

  • Toggle
    • CEC Summary
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Group by
    • None
    • CEC Ref #
    • Date Received
    • Applicant
    • Activity
    • Description
    • Location
    • Status
  • Clear filters
  • Advanced search
CEC Ref # Date Received Applicant Activity Description Location Status
Page 683 of 710 Total: 7092
  • Start
  • Prev
  • 678
  • 679
  • 680
  • 681
  • 682
  • 683
  • 684
  • 685
  • 686
  • 687
  • Next
  • End
8(2)
No records
6821/2024 2024-02-19 Jean Moreno 8 The establishment of a crop farm on 43 acres of land at Orosco Road, Matura Orosco Road, Matura Village Ack/FI Letter 4-Mar-2024
View
6830/2024 2024-02-28 Laurance Pierre 8 The subdivision of 0.6733 Hectares of a 2.4256 Hectares Parent Parcel of land to facilitate the regularisation of 16 exisiting residences at L.P. 1-731 Southern Main Road, Cochrane Village, Guapo L.P. #1-731, Southern Main Road,Cochrane NO CEC Required 13-March-2024
View
 8c(1)
No records
6822/2024 2024-02-21 Helen Simon   8c To clear, excavate, grade and fill land for construction of 3149.1M^2 of land with a gradient of 1:4 or more at windward road, Belle Garden Tobago Windward Main Road, Belle Garden Ack/FI Letter 4-Mar-2024
View
8 (a), 9, 33 (a), 40 (a), 41 (a) (1)
No records
6823/2024 2024-02-23 Jai Housing LTD. 8 (a), 9, 33 (a), 40 (a), 41 (a) The establishment of Infrastructure to Facilitate a Residential Developement on 10.48 Hectares of Land Located at William Street, Off Piarco Old Road, RedHill, D'Abadie Lot A Off William Street & Piarco Old Road, D'Abadie CEC ISSUED 03-May-2024
View
18 (a) (1)
No records
6824/2024 2024-02-27 Warner Construction and Sanitation Limited 18 (a) The Establishment of a dry mix concrete batching plant on 0.6 Hectares of land at the Cove Estate, Canoe Bay, Tobago COVE, Canoe Bay, Caanan, Tobago CEC ISSUED 01-July-2024
View
43 (a)(1)
No records
6825/2024 2024-02-26 Ramco Industries Limited 43 (a) The establishment of a Multi-Fuel Service Station for Gasoline including compressed natural has fuelling and a convenience store at lot #1-2 Chan Ramlal Road, Chaguanas. Lot #1-3 Chan Ramlal Road CEC ISSUED 23-August-2024
View
13 (a) (1)
No records
6826/2024 2024-02-27 The Ministry of Works and Transport (MOWT) 13 (a) The modification of an existing 401-meter Seawall, inclusive of establishment of Armour Rock toe protection and a 50-meter Armour Rock revetment in the vacinity of the 71.7 Km, Mark Paria Main Road. Paria Main Road 2nd Clarification Letter 04-April-2025
View
1 (a), 8 (c), 41 (c) (1)
No records
6827/2024 2024-02-27 Jarrod Singh 1 (a), 8 (c), 41 (c) The clearing, excavation and grading of 0.7368 Hectares of land for the establishment of an Agricultural crop farm and livestock farm at Durham Mills Road, Caparo LP H1 Durham Mills Road, Caparo Village Supplemental RFI Letter 26-April-2024
View
40 (a), 41 (b) (1)
No records
6828/2024 2024-02-27 Samdai Ramsaroop 40 (a), 41 (b) The Subdivision of 1.7337 Hectares of land to facilitate residential Development. Haniff Street La Quesa Road, Freeport Ack/FI Letter 15-Mar-2024
View
6(1)
No records
6829/2024 2024-02-28 Shervon Ifill 6 The establishment of a crop farm at the road reserve off Marper Farm Road, Le Branche Trace, Plum Road Village, Plum Mitan, Upper Manzanilla Road reserve of Mapper Farms Road Le Branche Trace, Plum Road Village, Plum Mitan, Upper Manzanilla No CEC Determination 02-May-2024
View
  • You are here:  
  • Home

Back to Top

© 2025 EMA E-Summary