No records
|
1325/2006 |
Petro-CanadaTrinidad and Tobago Block 1 (b) |
Coastal Dynamics |
To drill three (3) exploration wells at Block 1(a), offshore, Gulf of Paria, Trinidad. |
|
|
1321/2006 |
Ministry of Works and Transport. Project Implementation Unit, Highways Division. |
Ecoengineering Consultant Ltd. |
The construction of a new highway to Point Fortin as an alternative to the existing Southern Main Road. The extension runs through the southwest peninsula, from St. Mary's Junction to Point Fortin. |
|
|
1305 / 2005 |
|
|
The establishment of a small scale gas-to liquids plant for the conversion of gas reserves into zero sulphur, high cetane diesel, naphatha and LPG at Pointe-A-Pierre refinery, Pointe-A-Pierre. |
|
|
1283 / 2005 |
National Energy Company |
Coastal Dynamics Ltd. |
Establishment of harbour, port and marine terminal inclusive of associated works at Isthmus Road, Galeota |
|
|
1268 / 2005 |
EOG Resources Trinidad Ltd, |
Continental Shelf Associates Ltd. |
Drilling and Completion of two (2) additional production wells, offshore |
|
|
1263 / 2005 |
National Energy Corporation of Trinidad and Tobago Limited |
Lee Young and Partners Consulting Engineers and Project Managers |
Clearing, Laying of Pipline Establishment of Infrastructure Distribution of Potable Water, Point Lisas |
|
|
1260 / 2005 |
Venture Production (Trinidad) Ltd. (VPTL) |
Environmental Sciences Ltd. |
To conduct drilling operations in the Tabaquite Field. |
|
|
1254 / 2005 |
Methanol Holdings (Trinidad) Ltd., |
Ecoengineering Consultant Ltd. |
Establishment of a Facility for petroleum products, petrochemical products, Point Lisas |
|
|
1248 / 2005 |
Essar Steel Caribbean Ltd.; |
Senes Consultants Ltd. |
To conduct infrastructural works (clearing grading and backfilling of 203 hectares of land for the construction of an integrated steel complex at Point Lisas Industrial Estate, Point Lisas. |
|
|
1239 / 2005 |
BP Trinidad and Tobago LLC. (BPTT) |
Environmental Sciences Ltd. |
To develop the Cashima and NorthEastQueenBeach reserve by the installation of a Cashima Well Protector Platform (WPP) the pipeline and the drilling of the wells in the East Mayaro Block. |
|
|