1577/2006 |
BG Trinidad and Tobago Ltd. (BGTT). |
CSA International; |
To conduct drilling activities on six (6) development wells; To establish an oil platform and run a twenty inch (20") gas pipeline, to be tied back to the existing Hibiscus Platform, offshore in the Poinsettia Field, North Coast Marine Area, Trinidad. |
|
|
1563/2006 |
WestlakeTrinidad Unltd. |
Sage Environmental Consulting |
|
|
|
1536/2006 |
Inc., |
Coastal Dynamics |
|
|
|
1516/2006 |
|
|
To conduct coastal development activities, for the construction of a docking facilities for cargo vessels and reclamation of land for cargo storage facilities, at the Alutrint port facilities, La Brea Industrial Estate, La Brea. |
|
|
1497 / 2006 |
Optimal Services Ltd. |
Environmental Sciences Ltd. |
Proposed Drilling of 20 Production Wells inclusive of the Establishment of Storage Facilities and Pipelines from the Well Location to the Production Facilities |
|
|
1471 / 2006 |
Water and Sewerage Authority |
Royal Haskoning Ltd. |
The establishment of a new wastewater treatment plant at Salybia and Matura along with associated transmission network connecting the plants |
|
|
1469 / 2006 |
Water and Sewerage Authority |
Rapid Environmental Assessments (2003) Ltd. |
The establishment of a Regional Wastewater Plants, laying of sewage mains and the decommissioning of existing plants at Malabar and Arima |
|
|
1464/2006 |
Shorelands CMC Ltd. |
Jeffrey Guillen; |
To conduct coastal development for the the reclamation of a portion of land directly seaward of the site of The Renaissance, Shorelands, Glencoe. |
|
|
1444 / 2006 |
New Horizon Exploration Trinidad and Tobago Unlimited. |
James E. Stinson II; |
To conduct drilling operations by using steam injection on approximately sixty (60) wells at Parrylands, Point Fortin. |
|
|
1438 / 2006 |
Atlantic LNG Company of Trinidad and Tobago (ALNG). |
Coastal Dynamics |
To conduct coastal development works for the stabilization and protection of a slope east of Clifton Hill sea wall to ensure protection of the Guapo Bay shoreline.; To provide erosion control measures for the adjacent gas pipelines.; To widen and upgrade |
|
|