1321/2006 |
Ministry of Works and Transport. Project Implementation Unit, Highways Division. |
Ecoengineering Consultant Ltd. |
The construction of a new highway to Point Fortin as an alternative to the existing Southern Main Road. The extension runs through the southwest peninsula, from St. Mary's Junction to Point Fortin. |
|
|
1254 / 2005 |
Methanol Holdings (Trinidad) Ltd., |
Ecoengineering Consultant Ltd. |
Establishment of a Facility for petroleum products, petrochemical products, Point Lisas |
|
|