Print

CEC Summary

6698/2023
2023-07-19
WASA
40 (b)
The installation of 1.50km of 200mm Polyvinyl Chloride (PVC) pipeline along Southern Main Road from LABIDCO Roundabout to Vessigny Secondary School, inclusive of all crossings and associated appurtenances.
Along Southern Main Road, Vessigny
CEC ISSUED 7-September-2023